2-8 weeks depending on scope and disciplines
Coordinated BIM models, full documentation, QA/QC reporting
RVT, IFC, NWC/NWD, DWG, COBie
LOD 200 to 500 as required
We specialize in the creation of detailed BIM models LOD 200-500 that integrate architecture, structure and MEP facilities with full coordination. Result: 30% savings in change costs.
We capture the actual geometry by laser scanning and transform it into LOD 300-500 BIM models ready for: refurbishment, extensions and facility management. Ideal for historic buildings and industrial buildings.
Includes: implementation of BIM methodology, BEP definition, CDE configuration, team training. Trained teams reduce documentation time by 40%.
We coordinate mechanical, electrical, plumbing, structural and architectural. This not only reduces conflicts between systemsbut also improves overall project efficiency by up to 40%.
When using BIM methodology through Revit or ArchiCADwe facilitate collaboration between architects, engineers and contractors, minimizing errors and rework times.
Our experience and commitment make us the best partner for your construction and digital design projects. Obtaining ISO 19650-2:2018 certification means that we comply with the most advanced most advanced guidelines in BIM information management, bringing great benefits.
+11 years transforming projects around the world with certified BIM methodology
With our ISO 19650-2:2018 certification, we guarantee that every project follows the highest standards of quality and BIM information management.
Version control, naming conventions and workflows according to international standards
Each change documented with responsible party, date and justification according to ISO
Verified export to open formats for openBIM and reuse in FM
Projects where we have made a difference
Problem
Complex MEP coordination with +200 interferences detected in 2D drawings
Solution
BIM modeling LOD 350 of architecture, structure and MEP with clash detection
Result
0 interferences on site, saving 280.000€ in changes, delivery 3 weeks earlier
Problem
Industrial building without updated plans, multiple undocumented renovations
Solution
Laser scanning + as-built LOD 400 modeling of existing structure
Result
Model with ±3mm accuracy, rehabilitation project approved in 1st revision
Problem
Public tender required BIM LOD 300 in 4 weeks, team with no BIM experience
Solution
Express modeling + complete documentation according to tender conditions
Result
Tender won, technical assessment 95/100, model used in construction
We answer your questions about BIM
Version control, naming conventions and workflows according to international standards
3D Global Consulting is a leading firm in the Architecture, Engineering and Construction (AEC) industry, specializing in BIM methodology.
Quality Policy | © All rights reserved | Designed By Datadicoco